Water Sanitation Project

Below you will find information, pictures and video from a recent trip to Ethiopia showing the reactions of the people and the work that is currently being done on the project to bring clean water to the region of Tembien, Ethiopia. $2.4 million (USD) is needed to make the water sanitation project a reality. Your donations are greatly appreciated!

Videos (September 2008):
Spring #3 & Pond
  

Project Schematic (.jpg)
Project Schematic

Groundwater Well (.jpg)
Groundwater Well

 

Project Objectives:

Process Tank
30,000 gallon

Process Tank

Sand Filter Systems

Sand Filter

Bag & Cartridge
Filter Systems
Carbon Absorbers

Carbon Absorbers

Chlorine Generator

Chlorine Generator

Pre-distribution
30,000 gallon

Holding Tank

Technical & Mechanical Team

Collectively, the Technical Team has engineered, designed, built, installed and operated over 250 water treatment systems to date.

Civil, Structural, Geological Technical Team

  1. Civil Engineer: Responsibilities include land survey, layout of the treatment plant facility major components, recovery, treatment and distribution systems, creation of drawings as needed for local requirements.
  2. Geologist/Hydrogeologist: Assistance with locating local sources of groundwater, surface water and development of plans to recover these resources. Will work with civil engineer to establish the plans for the layout of the treatment system major components [foundation work etc.].
  3. Structural Engineer: Will assist with review of the plans for building major system components [concrete holding tanks etc.] ,evaluation of domestic building materials [cement] and utilizing other building materials for the construction of the treatment plant, including the use of electrical supply for the grid.
  4. Health Engineer: Establish standards for drinking water quality based on our recommendations and those of the local laws/regulations.
  5. Local political representative/information officer: This person will assist us in the interface with government and the public regarding this facility, it's purpose and operations, and be responsible for working with additional areas that require this type of facility in terms of overall planning, instigation and placement.